Timing without fake promises

Production and delivery timing for signage orders

Buyers need to know when an order can move, what can delay it and when a quote is safer than forcing a deadline into a calculator. These timing bands are practical guide rails, not a blanket promise for every product and quantity.

Before timing is confirmed

  • Payment must be clear or approved through the agreed account path.
  • Artwork must be supplied, checked and approved on proof.
  • Materials, hardware and freight path must be available.
  • Rush or event-date work must be accepted by production.

Turnaround shown honestly

Production timing starts after proof approval and payment, with quote-first handling for oversized, installed or unusual work.

View timing bands

Artwork checked before print

We check size, bleed, resolution, cut paths, white ink and finishing notes before releasing production.

Artwork help

Online pricing where safe

Standard products show online pricing. Mixed, site-specific or rollout work is quoted by a real production team.

Start a quote

Support for repeat buyers

Saved artwork, approved specs and trade account pathways make reorders cleaner for teams, agencies and rollouts.

Trade accounts

Typical bands

Production timing starts after proof approval

The same product can move faster or slower depending on quantity, artwork condition, finishing, hardware and the production queue. The safest promise is the one confirmed against the actual job.

Printed graphics and standard display

Decals, stickers, posters, A-frames, corflute and many banner products

Often 3-5 business days after proof approval

Quantity, finishing, artwork readiness and material availability can change this band.

Acrylic, fabricated and premium interior signs

Acrylic reception signs, letters, door signs, room signs and specialty finishes

Often 5-10 business days after proof approval

Laser cutting, polishing, paint, mounting and assembly steps can add time.

Large, installed or multi-product projects

Shopfront packages, rollouts, illuminated signs, large panels and site-specific work

Often 10-20 business days or quoted case by case

Site checks, installation, oversized freight and multiple proof stages must be planned.

Freight clarity

Delivery path depends on size, weight and fragility

Pickup from Botany

Useful for local orders, urgent collection and fragile work where the buyer wants direct handover.

Sydney metro courier

Used for many local signs, panels and packaged orders where direct courier handling is safer than parcel sorting.

Parcel or tracked freight

Suitable for smaller packed items under carrier size and weight limits, with transit time after dispatch.

Oversized freight

Used for full sheets, long poles, frames, pallets, fragile fabricated signs and heavy multi-carton orders.

For policy rates and delivery terms, see the formal shipping policy.

Order clarity

What has to happen before dispatch

Most delays come from missing artwork, unclear proof approval, unavailable materials or unsafe freight assumptions.

  1. 1

    Choose the product

    Pick the material, size, quantity and finish that matches the job.

  2. 2

    Upload or send files

    Supply print-ready artwork now, at checkout, or by reply after the order is placed.

  3. 3

    Approve the proof

    We flag file issues and send a digital proof before printing, cutting or fabrication starts.

  4. 4

    Production and dispatch

    The order moves through print, finishing, quality check, packing and delivery or pickup.

Production and delivery questions

When does the production clock start?

Production timing starts after payment clears and the production proof is approved, not when the first enquiry is submitted.

Can Platinum promise next-day production?

Only where the product, quantity, artwork and production capacity make that safe. Rush requests are reviewed before a deadline is confirmed.

Is delivery time included in production time?

No. Production time is the time to manufacture and dispatch or prepare for pickup. Carrier transit time starts after dispatch.

Why are some jobs quote-first?

Oversized freight, installation, mixed product kits, site access, unusual materials and hard campaign dates all need a human check before timing is safe.

Australian production

Printed and finished in-house on our own production line.

Proof before production

Every custom job can be checked before release.

Online plus managed

Standard jobs can order online; complex jobs can move into a quote.

Trade-ready support

Repeat buyers can keep specs, artwork and reorder references together.